| Building Construction Software is the software | | | | construction project. This software generates |
| that is used to resolve and manage the building | | | | project specification reports of the cost |
| construction issues like cost of construction, the | | | | estimates, transmittal, insurance of the project |
| type of material used for construction, total | | | | and also produces contracts that are to be signed |
| budget and the time required to complete the | | | | and accepted between clients, contractors and |
| construction project starting from zero up till its | | | | suppliers of the construction material. |
| end. This software consists of multiple modules | | | | This software also efficiently collects the complex |
| installed in it which helps at each and every step | | | | structural details of the projects from the data |
| of the construction; from cost issue to selection | | | | provided to it. There are six phases of using |
| of material to cost management problems. It | | | | Building Construction Software which are: |
| helps in collecting the clients' requirements of the | | | | 1. Conceptual Design phase |
| time to complete the project, the cost involved | | | | 2. Engineering phase |
| and the quality and standard of the material to be | | | | 3. Detailing Design phase |
| used for construction. | | | | 4. Fabrication phase |
| This software manages the record for the bids | | | | 5. Construction phase |
| made for a certain project, billing agenda of the | | | | 6. Maintenance phase |
| project, order status including accept, reject or | | | | The drawings and 3d models of the project are |
| update status. An important advantage of using | | | | also generated by this software alone, hence |
| this software is that all the records are maintained | | | | eliminating the need of using different software. |
| on a computer system, thus removing the need | | | | The Building Construction Software has opened |
| for paperwork and the fault of duplication of data. | | | | new horizons for the builders, architects and |
| It also helps in making an estimate about the time | | | | contractors to take advantage from the latest |
| and period required for the completion of a | | | | software technologies. |