Construction of the Empire State Building

The 1453-foot, 103-story Empire State Buildingable to provide quality work, and willing to adhere
came to be a project because General Motorsto the allotted timetable. Time had to be
executive John J. Raskob wanted to beat hisscheduled nearly to the minute.
arch-rival in creating the tallest building in the world.The schedule dictated that each section of the
Excavation for the building began in January 1930building process overlapped - not a moment was
and just two months later the construction of theto be wasted. Planning started immediately and a
building started. The schedule on this project wasfast-track construction approach was adopted,
as adventurous as the design. The architectswhich is common place in the United States today.
planned that the project would be completed inThis technique involves starting the construction
only eighteen months. The contractor employedprocess before the designs are fully completed in
for the project was general contractors Starrettorder to reduce delays and inflation costs.
Brothers and Eken, who put in a bold bid to winDemolishing the existing building on the site and
the job.laying the foundations simultaneously helped to
Not only did they promise that they could get thesave time too. Time was also saved by making
job done on time, but they announced that theythe process of moving materials more efficient. A
would purchase custom-fitted equipment to fulfilrailway was built at the construction site to move
the contract. Their opinion was that this wouldmaterials quickly: each cart held eight times more
cost less than renting second hand equipment andthan a wheelbarrow.
would be more efficient. The investment groupWhile the outside of the building was being
agreed with them.constructed, electricians and plumbers began
The supplies for the building had to be made atinstalling the internal necessities of the building. The
the plants in as close to finished state as possible,building was being erected at a rate of four and a
to minimize preparatory work needed at the site.half storeys a week! The project became a
The companies they hired had to be dependable,model of efficiency.