| Pouring a new foundation for an addition | | | | |
| | | | | |
| When you are building an addition onto your | | | | A concrete cutting machine sometimes called a |
| existing home you will most likely need to pour a | | | | wall saw or a wet saw is usually powered using a |
| new foundation for the new addition. You can | | | | hydraulic motor. The main hydraulic pump is |
| also build your addition on Piers, this is OK for | | | | usually mounted to a truck and the saw is |
| three season rooms or sunrooms but not | | | | connected using hydraulic hoses. Water is used to |
| recommended for year round living additions, such | | | | lubricate the blade and to control the dust. Make |
| as bedrooms, bathrooms and kitchens. Before | | | | sure you protect the inside of the basement with |
| your contractor begins excavation he should have | | | | a plastic sheet. |
| the area surveyed for any underground utilities. | | | | |
| Underground gas lines, power lines, sewer lines, | | | | |
| water supply lines, septic tanks, oil tanks are just | | | | |
| a few of the possible obstacles your contractor | | | | A concrete pump is needed when a cement |
| may need to go around. If any of these are in | | | | mixer cannot access the construction site. Many |
| the way they will need to be moved prior to | | | | times additions are built in the back of a house |
| excavation. | | | | and there is not enough space for a large cement |
| | | | | mixer to get around the sides of the house. |
| | | | | Sometimes a cement mixer has enough space to |
| A typical foundation will consist of three primary | | | | get to the cosnstruction area but there is a hill |
| parts, (1) the footing (2) the wall (3) the floor. A | | | | that is too steep, or sometimes the cement |
| typical foundation is almost always poured in the | | | | mixer would have to drive over a septic tank to |
| three steps. | | | | reach the construction area. If you have a septic |
| | | | | tank make sure it is marked on you property so |
| First the foundation area will need to be | | | | that no heavy equipment can drive over it. A |
| excavated to the desired depth. The depth will | | | | cement mixer vegicle that is full of concrete can |
| depend on the type of foundation. A full | | | | wieght 80,000 pounds. |
| basement will require a hole to be excavated at a | | | | |
| depth of about 8-10 feet. A crawl space will | | | | |
| require a hole to be excavated at a depth of 3-4 | | | | |
| feet. The footing should always be at least | | | | Pinning the new wall to the existing involves drilling |
| 42” below grade (surface of the grass) in the | | | | the existing foundation and driving in rebar. The |
| northeast. Your contractor should know all of | | | | rebar will act as a mechanical fastener between |
| your local codes. If you are adding a full basement | | | | the new wall and the existing wall. This is a must. |
| don’t forget that your contractor will cut an | | | | If your contractor doesn’t do this there is a |
| opening from the existing basement to the new | | | | good chance that the concrete wall will break and |
| basement. That can get messy so make sure | | | | cave in when he is back filling. These pins keep |
| that all of your valuables in the existing basement | | | | the new wall from pushing in when there is a lot |
| are covered to be protected from excessive | | | | of wieght from vehicle driving around the |
| dust and make sure that your valuables are far | | | | perimeter of the foundation. |
| away from the area where the cutting will be | | | | |
| done. A concrete wall cutting machine is very | | | | |
| dusty and messy. | | | | Waterproofing the outside of a foundation wall is |
| | | | | very important. This can be done either by rolling |
| (1) The footings have been poured and the area | | | | the water proofing on or spraying it on. The |
| under the slab and around the footings is filled | | | | water proofing should cover the walls, where the |
| with crushed stone to help with drainage so that | | | | walls meet the footings, and especially where the |
| water does not penetrate through the foundation | | | | walls meet existing foundation. The seam where |
| and enter the basement. Plastic drainage piping | | | | the walls meet the existing foundation is the most |
| has been installed around the outside of the | | | | crucial area to water proof. A good contractor will |
| footings and covered with geofabric. A groove is | | | | cover this area multiple times. That seam is the |
| carved in the top of the foundation so that the | | | | most vulnerable point where groud water can |
| newly poured concrete for the walls will be | | | | enter the basement. Waterproofing material is |
| fastened to the footing. This groove prevents the | | | | usually tar based or rubber based. |
| wall from sliding off of the footing when lateral | | | | |
| pressure is applied. | | | | |
| | | | | Drainage is the most important method to |
| | | | | eliminating water intrusion in your new basment. A |
| (2) The walls have now been poured. Once the | | | | good drainage system should take any water |
| walls are poured the forms are stripped and the | | | | away from the foundation. Water that’s runs |
| outside of the foundation walls get backfilled. | | | | off of the roof should be controlled using gutters |
| Notice the perimeter fencing around the | | | | and down spouts. The downspouts should have |
| foundation. It is very important that your | | | | extensions on the groound so the rain water is |
| contractor always has perimeter fencing up | | | | not dumped directly at the base of the |
| around the foundation, especially overnight when | | | | foundation. You can also have your contractor lay |
| the contractor is not there. This is extremely | | | | draiange piping around the foundation. Solid |
| important; your homeowners insurance could be | | | | drainage piping can be used to collect the |
| liable for any injury in the case that someone falls | | | | rainwater and discharge it far away from the |
| in. A thick plastic sheeting has been placed over | | | | house. Perforated drainage piping can be installed |
| the crushed rock to help in preventing moisture | | | | around the perimeter of the foundation to collect |
| from getting through the concrete slab and into | | | | ground water and carry it away from the |
| your basement. Once the plastic is placed we are | | | | foundation. |
| ready to pour the floor. | | | | |
| | | | | |
| | | | | |
| | | | Pre-Cast basement entrances are installed after |
| (3) Once the concrete floor has been poured we | | | | the walls have been poured. The precast |
| are ready to begin framing. The concrete floor | | | | basement entrance can be ordered from a local |
| of your basement should be smooth and level. A | | | | concrete supply company. Usually your contractor |
| good foundation contractor can do this relatively | | | | will take care of ordering the unit. The supply |
| easily. | | | | company that delivers the basement entrance will |
| | | | | also install it. It is usually craned into place where |
| | | | | the concrete contractor has left an opening for it. |
| | | | | It is bolted to the new foundation and |
| | | | | waterproffed. Then the actua metal door will be |
| | | | | installed. Most companies use Bilco doors. |
| | | | | Don’t forget to paint them at the end of the |
| | | | | project, the factory color is usually just a primer |
| | | | | paint. |
| The Details | | | | |