Self-Compacting Concrete Applications

The use of self compacting concrete has beenautomatically. Subsequently, it was noted that the
encountering a gradual increase ever since aself-compacting concrete reduced the period of
prototype of the concrete developed in the yearanchorage construction by 20 percent, from 2.5
1988. Some of the main reasons for employingyears to 2 years.
self compacting concrete are:This concrete was also utilized for the wall of a
huge LNG tank of Osaka Gas Company. The
1. To minimize the period of construction.concrete casting of this wall culminated in June
2. To ensure structure compaction, particularly1998. And the self compacting concrete volume
when vibrating compaction is tough in confinedthat was used in the tank came to a consolidated
zones.12,000 m3. The fact that self compacting
3. To eliminate noise produced due to vibration;concrete was adopted naturally implies the
this can be particularly effective in concretefollowing:
product plants.The lots number reduced to 10 from 14, since
This just goes to imply that the present state ofthe height of one concrete casting lot was
self compacting concrete is indeed a special oneincreased.
rather than the standard concrete.There was a reduction in the number of workers
A good example of an application of this concreteto 50 from 150.
is the Akashi-Kaikyo (Straits) Bridge anchorages.The period of construction of the structure
The bridge that was opened in April 1998 is areduced to 18 months from 22 months.
suspension bridge that has the longest span in theUsually, self compacting concrete is made use of
world, at 1991 meters.in concrete products to remove vibration noise.
The cast concrete volume that was required forThe working environment is thus enhanced at
the two anchorages reached around 290,000 m3.plants and it becomes possible for concrete
A novel construction system that takes completeproduct plants to be situated in urban areas.
advantage of this concrete performance wasIn 1996, the annual production of concrete
specially introduced for this. The concrete wasproducts that make use of self compacting
missed at the batcher plant that was locatedconcrete was over 200,000 tons
beside the site and then was discharged out ofThe undeniable truth is that self compacting
the plant. The concrete had to be transportedconcrete requires a lot of care and experience,
200 meters via pipes to the casting site. Here,when compared to conventional vibrated
there was an arrangement of rows of pipes,concrete. Personnel at plants definitely require
about 3 to 5 meters apart. After this, thetraining and the right amount of expertise for
concrete was cast from gate valves that weresuccessful production and handling of SCC. Initially,
located at an interval of 5 meters alongside theit might be necessary to perform several tests
pipes.than usual in order to learn about the intricacies
To ensure that the cast concrete surface level isand skill involved.
maintained, the valves were controlled